Friday, May 30, 2008

phase 3-update 3

So, what the heck has Bruce actually done this last week since the sea trial trip? Here is the list, if for no other reason than to have the joy of crossing them off the TODO list once AGAIN!:

  • Gartside here to replace packing on shaft seal
  • ordered replacement batteries from Nanaimo Marine (Rolls-Surrette, one of few true deep cycle batteries, made in Nova Scotia)
  • picked up outboard motor at shop in Victoria
  • parts for new outboard tank and installed
  • new tethers for harnesses; added snap shackle to make it easy to disconnect
  • repainted length indicators on anchor chain
  • repainted windlass
  • cleaned out dried mud in anchor locker
  • >repaired lingering water leaks
  • >repaired/improved backup foot-pump in galley for sea water and fresh water; cleaned all bronze fittings and added new block valve.
  • new positive latch on anchor locker door
  • replaced oil in windlass gear box
  • greased/checked steering cables
  • put on chaff guard on fuel tank vent line
  • bimini completed (by Hank) and installed
  • marked/colour coded dock lines and genakker lines
  • purchased ATN sock for Genakker
  • installed drinking water filter
  • removed jack line pad eyes and took to shop to have steel backing plates made up [ ready Monday??]
  • measured up lee cloths for aft cabin
  • booked Blackline to weld/repair life-line fittings
  • called re used life raft: Monday/tuesday?
  • tracked down compass expert, nothing done yet
  • paid annual moorage contract at Canoe Cove [ouch!!...multiple boat units!!]
  • tracked down Type 1 life jacket
  • got my hair cut!!
  • re-scheduled travel to Saudi

I have NOT yet located the elusive camera cable so I have no new photos to upload to Blog.
I'm off to forage for food and put some ale into the ship's grog storage for later this evening.

No comments: